2021 Liquid Road Project to Begin
Jasper - The Jasper Street Dept. along with contractor, Seal Master, will begin their annual Asphalt Pavement Preservation Projects (Liquid Road), beginning on Monday, June 28, barring inclement weather or any other unforeseen events.
This surface coating is comparable to a seal coating, however, it is thicker, more durable & also designed to wear longer than an ordinary seal coating.
Motorists will not be allowed on these streets during the application of Liquid Road nor until this substance is thoroughly dry, which is approximately 2 days.
Affected Residents will be notified via a door hanger the day before the application begins.
Residents must have all vehicles removed from garages, streets & driveways prior to 7:00 A.M. on the day which the application is applied to their street & will not be allowed on this street until it is re-opened (barricades removed)
Each street which is treated, will be closed for approximately 2 days, depending on weather & material drying conditions.
Following is a list of those streets which will be affected: (will not necessarily be processed in this order)
Grassland Hills – south end (south of 31st St)
Victory Dr – 36th St to 37th St
Leslie Dr – Reyling Dr to 36th St
Rhine Strasse – dead end, south of 43rd St
Hartford Dr – Portersville Rd path
Soliga St – entire
Evergreen Ln – N of Brescher Dr
Sugar Cane Ct – entire
Judith Ave – entire
Ladino Ln – Evergreen Ln to Bluegrass Ln
Suzanna Ave - entire
The Jasper Street Dept. would like to thank all those affected, for your patience & cooperation during this project in helping the City of Jasper to keep our infrastructure sound.